[{"data":1,"prerenderedAt":426},["ShallowReactive",2],{"blog-bga-board-rework-en":3,"header-nav-en":90},{"title":4,"description":5,"date":6,"lastUpdated":6,"category":7,"image":8,"readingTime":9,"wordCount":10,"timeRequired":11,"htmlContent":12,"tableOfContents":13,"tags":38,"slug":44,"jsonld":45},"BGA Board Rework: How to Decide, Inspect and Verify","Plan BGA board rework around fault evidence, thermal limits, board-site condition and an agreed inspection and release decision.","2026-11-17","technology","",9,1755,"PT9M","\u003Cp>A suspected BGA fault is a reason to investigate, not proof that replacing the package will fix the board. \u003Cstrong>Before authorizing board-level rework, establish the fault evidence, the assembly&#39;s heating and handling history, and the conditions under which the exposed board site and replacement will be accepted.\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp>Board-level BGA rework removes a package from an assembled PCB and, if the site is accepted, installs an approved replacement or appropriately prepared device. Off-board reballing prepares the solder-ball array on a separate package; it is a different scope. See \u003Ca href=\"\u002Fen\u002Fblog\u002Fwhat-is-bga\">what is a BGA\u003C\u002Fa> for package fundamentals and \u003Ca href=\"\u002Fen\u002Fpcba\u002Fbga-reballing\">BGA reballing\u003C\u002Fa> for the off-board process.\u003C\u002Fp>\n\u003Ch2 id=\"does-the-evidence-justify-removing-the-bga\" data-anchor-en=\"does-the-evidence-justify-removing-the-bga\">Does the evidence justify removing the BGA?\u003C\u002Fh2>\n\u003Cp>Start with the fault and the test conditions, not just the package&#39;s location. An intermittent connection near a BGA could involve a solder joint, the package, the board or another part of the circuit. A symptom that changes when the assembly is warmed can help focus an investigation, but it does not by itself locate the failed interface or prove the device is defective.\u003C\u002Fp>\n\u003Cp>Record the board revision, serial number, affected function or net, test setup, fault conditions and previous inspection. Preserve images and results before cleaning, probing or heating changes the evidence. Compare with known-good units or an applicable baseline where available. If failure analysis is needed, agree which samples may be consumed and what must remain intact before removing a part.\u003C\u002Fp>\n\u003Cp>Decide what the proposed operation is intended to establish. For example, replacing the component may be an authorized troubleshooting step, but the team should agree beforehand how it will interpret a board that passes after replacement and what additional evidence is needed to determine the original cause.\u003C\u002Fp>\n\u003Ch2 id=\"what-should-be-checked-before-heating-the-board\" data-anchor-en=\"what-should-be-checked-before-heating-the-board\">What should be checked before heating the board?\u003C\u002Fh2>\n\u003Cp>The BGA, its neighbors and the board may have different thermal and handling limits. Review the actual assembly and its history with the process owner:\u003C\u002Fp>\n\u003Cul>\n\u003Cli>\u003Cstrong>Package and board identity:\u003C\u002Fstrong> part number, package drawing, pin-one orientation, board revision, location, solder materials and any previous modification.\u003C\u002Fli>\n\u003Cli>\u003Cstrong>Access and constraints:\u003C\u002Fstrong> nearby devices, connectors, shielding, underfill, adhesive or coating that may restrict removal or affect the selected process.\u003C\u002Fli>\n\u003Cli>\u003Cstrong>Thermal history:\u003C\u002Fstrong> known assembly, rework and other heating events, and any customer or product limits. An unknown history is an open item, not a zero-cycle record.\u003C\u002Fli>\n\u003Cli>\u003Cstrong>Moisture and materials:\u003C\u002Fstrong> the condition and exposure history of the board, target package and neighboring moisture-sensitive parts. Consult the applicable component and board instructions before any conditioning.\u003C\u002Fli>\n\u003Cli>\u003Cstrong>Process and authorization:\u003C\u002Fstrong> equipment and a board-specific profile appropriate to the selected materials and components, measurements at relevant locations, handling precautions and the authority to stop or change the scope.\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp>Texas Instruments&#39; AN-1126 BGA application note describes directing heat to the solder during removal while avoiding overheating adjacent components. Its 2004 guidance concerns general PBGA packages and variants; the process settings and inspection statements in it are not a recipe or acceptance criteria for every assembly. TI&#39;s MSL and reflow guidance also notes that moisture can enter packages after initial assembly and matter before further heating. Determine any conditioning from the actual parts, board and applicable controlled requirements, not a generic bake schedule.\u003C\u002Fp>\n\u003Ch2 id=\"where-should-the-work-stop-for-a-decision\" data-anchor-en=\"where-should-the-work-stop-for-a-decision\">Where should the work stop for a decision?\u003C\u002Fh2>\n\u003Ctable>\n\u003Cthead>\n\u003Ctr>\n\u003Cth>Checkpoint\u003C\u002Fth>\n\u003Cth>Evidence to collect\u003C\u002Fth>\n\u003Cth>Decision before proceeding\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003C\u002Fthead>\n\u003Ctbody>\u003Ctr>\n\u003Ctd>Before removal\u003C\u002Ftd>\n\u003Ctd>Fault record, assembly identity, access, neighboring parts, material and thermal history\u003C\u002Ftd>\n\u003Ctd>Is the requested rework authorized, and is there a suitable process and acceptance plan? Hold if essential limits or approval are missing.\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>After removal\u003C\u002Ftd>\n\u003Ctd>Images and observations of the board site, removed package and surrounding area; traceable removal record\u003C\u002Ftd>\n\u003Ctd>Can the site be prepared and accepted under the approved procedure? Damage or an unclear condition calls for an engineering disposition before installing a part.\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Before replacement\u003C\u002Ftd>\n\u003Ctd>Site condition, correct replacement identity and orientation, solder materials and agreed installation process\u003C\u002Ftd>\n\u003Ctd>Is the selected device approved and the site ready? Reuse or reballing of a removed package is a separate decision.\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>After installation\u003C\u002Ftd>\n\u003Ctd>Inspection images, process record and specified electrical or functional results\u003C\u002Ftd>\n\u003Ctd>Does the assembly meet the agreed requirements? Record unresolved findings and the authorized disposition.\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\u003C\u002Ftable>\n\u003Cp>Removal and site preparation can alter the evidence. Document the condition at each stage, and avoid treating an appearance change after cleaning as proof of the original condition. If a land, trace or surrounding laminate is damaged, do not assume a replacement package will restore the board: evaluate whether a separate repair is allowed and how it will be verified.\u003C\u002Fp>\n\u003Ch3 id=\"example-a-damaged-land-stops-replacement\" data-anchor-en=\"example-a-damaged-land-stops-replacement\">Example: a damaged land stops replacement\u003C\u002Fh3>\n\u003Cp>Suppose a test team finds an intermittent connection on assembly \u003Cstrong>A12, serial 084\u003C\u002Fstrong>, near device \u003Cstrong>U7\u003C\u002Fstrong>. The symptom occurs under a defined operating test. A neighboring known-good assembly passes that same test, but the available results do not establish whether the fault is in U7, its connections or the board.\u003C\u002Fp>\n\u003Cp>The owner approves removal of U7 for further examination and defines the handling, process limits and inspection plan. After removal, the technician photographs the site and observes that one copper land appears lifted. This is a hypothetical observation, not a determination of the original cause: the damage may have existed before removal or could have been affected by it.\u003C\u002Fp>\n\u003Cp>The technician \u003Cstrong>stops before installing a replacement\u003C\u002Fstrong>. The team records the affected location, retains the removed device and images, and compares the site with the drawing and applicable acceptance requirements. An authorized engineer decides whether further examination, an approved board repair, or board rejection is appropriate. If a repair is permitted, the record identifies its method and verification; if not, the team does not silently substitute a new BGA for the site decision. For the investigation of a possible fracture beneath a land, see \u003Ca href=\"\u002Fen\u002Fblog\u002Fpcb-pad-cratering\">PCB pad cratering\u003C\u002Fa>; a lifted land alone does not establish that diagnosis.\u003C\u002Fp>\n\u003Cp>If the site is accepted for replacement, the team can install the approved device and perform the agreed inspection and functional tests. A passing test after replacement records the result under those test conditions; it does not, on its own, prove why U7&#39;s original connection was intermittent or establish service life.\u003C\u002Fp>\n\u003Ch2 id=\"how-should-the-replacement-be-selected\" data-anchor-en=\"how-should-the-replacement-be-selected\">How should the replacement be selected?\u003C\u002Fh2>\n\u003Cp>A new device, a recovered device and a reballed device have different histories. Confirm the approved manufacturer part number, package and ball map, orientation, ball alloy and compatibility with the assembly process. For a reused package, also review removal history, package and pad condition, traceability, moisture status and whether reuse is allowed by the applicable requirements.\u003C\u002Fp>\n\u003Cp>Reballing changes the solder-ball array. It does not prove the silicon or package is electrically sound. A reballed package still needs whatever device-level assessment, installation process and board-level verification the product requires. Do not presume that a package can be recovered simply because it can be removed.\u003C\u002Fp>\n\u003Ch2 id=\"what-can-inspection-and-testing-prove\" data-anchor-en=\"what-can-inspection-and-testing-prove\">What can inspection and testing prove?\u003C\u002Fh2>\n\u003Cp>Each method answers a different question. Define the equipment, views, test conditions, sampling and acceptance criteria for the actual assembly.\u003C\u002Fp>\n\u003Ctable>\n\u003Cthead>\n\u003Ctr>\n\u003Cth>Evidence\u003C\u002Fth>\n\u003Cth>Useful for\u003C\u002Fth>\n\u003Cth>Important limit\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003C\u002Fthead>\n\u003Ctbody>\u003Ctr>\n\u003Ctd>Optical inspection of the exposed site\u003C\u002Ftd>\n\u003Ctd>Documenting accessible lands, solder mask, traces and visible damage before replacement\u003C\u002Ftd>\n\u003Ctd>It cannot reveal every subsurface crack or prove all board interfaces are sound.\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>X-ray after installation\u003C\u002Ftd>\n\u003Ctd>Examining selected hidden features such as ball position and possible bridges or voids, subject to equipment and viewing conditions\u003C\u002Ftd>\n\u003Ctd>An apparently normal image cannot establish every joint&#39;s integrity or rule out all hidden fractures and device damage.\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Electrical and functional tests\u003C\u002Ftd>\n\u003Ctd>Checking specified connections and functions under defined conditions\u003C\u002Ftd>\n\u003Ctd>A pass does not establish workmanship at every hidden joint or predict long-term performance.\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Sectioning or other destructive analysis\u003C\u002Ftd>\n\u003Ctd>Examining a selected location and physical structure when authorized\u003C\u002Ftd>\n\u003Ctd>It consumes or alters the specimen, and a single section does not represent every joint or unit.\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\u003C\u002Ftable>\n\u003Cp>Agree the applicable acceptance document and revision rather than adopting a generic void percentage or assuming that every potential defect is visible in one image.\u003C\u002Fp>\n\u003Ch2 id=\"what-should-a-rework-request-include\" data-anchor-en=\"what-should-a-rework-request-include\">What should a rework request include?\u003C\u002Fh2>\n\u003Cp>Provide the assembly identification and revision, quantity and serials, the affected device and location, available design and package information, and a concise fault history with original test conditions. Identify known prior processing, adjacent heat-sensitive components, underfill or coating, material restrictions, and whether the replacement is new or to be evaluated for reuse.\u003C\u002Fp>\n\u003Cp>Ask the proposed provider to identify the work it can perform, the necessary inspection and test scope, records available, stop conditions, approval points for unexpected damage, and the disposition of removed parts and unrecoverable boards. Agree the applicable acceptance criteria and who has authority to release the assembly. Agree who controls rework and its records and who is responsible for product-level qualification and release.\u003C\u002Fp>\n\u003Cp>APTPCB offers PCB fabrication and \u003Ca href=\"\u002Fen\u002Fpcba\u002Fturnkey-assembly\">turnkey PCB assembly\u003C\u002Fa>, as well as \u003Ca href=\"\u002Fen\u002Fpcba\u002Fbga-reballing\">off-board BGA reballing\u003C\u002Fa>. For a \u003Ca href=\"\u002Fen\u002Fquote\">PCB or assembly quote\u003C\u002Fa>, share the assembly information and required scope; confirm whether the proposed board-level rework, inspection and records are available for the specific project.\u003C\u002Fp>\n\u003Cdiv data-component=\"BlogQuickQuoteInline\">\u003C\u002Fdiv>\n\n\u003C!-- faq:start -->\n\u003Ch2 id=\"frequently-asked-questions\" data-anchor-en=\"frequently-asked-questions\">Frequently asked questions\u003C\u002Fh2>\n\u003Ch3 id=\"is-there-a-universal-maximum-number-of-bga-rework-cycles\" data-anchor-en=\"is-there-a-universal-maximum-number-of-bga-rework-cycles\">Is there a universal maximum number of BGA rework cycles?\u003C\u002Fh3>\n\u003Cp>No single count proves an assembly can tolerate another heating operation. Follow the actual device, board, customer and process requirements, and review the known history and condition before authorizing work.\u003C\u002Fp>\n\u003Ch3 id=\"can-a-passing-x-ray-image-confirm-a-successful-rework\" data-anchor-en=\"can-a-passing-x-ray-image-confirm-a-successful-rework\">Can a passing X-ray image confirm a successful rework?\u003C\u002Fh3>\n\u003Cp>It is one part of the agreed evidence. X-ray has method and viewing limitations; assess its findings alongside the process record and the inspection and tests required for the product.\u003C\u002Fp>\n\u003Ch3 id=\"is-reballing-the-same-as-replacing-a-bga-on-the-board\" data-anchor-en=\"is-reballing-the-same-as-replacing-a-bga-on-the-board\">Is reballing the same as replacing a BGA on the board?\u003C\u002Fh3>\n\u003Cp>No. Reballing prepares an off-board package&#39;s solder-ball array. Board-level replacement also involves removal, site assessment, placement and verification of the assembled board.\u003C\u002Fp>\n\u003Ch3 id=\"does-a-board-that-works-after-replacement-need-further-review\" data-anchor-en=\"does-a-board-that-works-after-replacement-need-further-review\">Does a board that works after replacement need further review?\u003C\u002Fh3>\n\u003Cp>Use the agreed release plan. A successful functional test can establish that the functions actually exercised met their test criteria under those conditions, but it does not necessarily identify the original fault or cover all workmanship and reliability requirements.\u003C\u002Fp>\n\u003C!-- faq:end -->\n\n\u003Ch2 id=\"technical-references\" data-anchor-en=\"technical-references\">Technical references\u003C\u002Fh2>\n\u003Cul>\n\u003Cli>Texas Instruments, \u003Ca href=\"https:\u002F\u002Fwww.ti.com\u002Flit\u002Fan\u002Fsnoa021c\u002Fsnoa021c.pdf\">AN-1126: \u003Cem>BGA (Ball Grid Array)\u003C\u002Fem>\u003C\u002Fa>. Sections 6.8-6.11 address PBGA removal, site preparation, placement and reflow; its historical guidance does not establish a process or acceptance criteria for every assembly.\u003C\u002Fli>\n\u003Cli>Texas Instruments, \u003Ca href=\"https:\u002F\u002Fwww.ti.com\u002Flit\u002Fan\u002Fspraby1\u002Fspraby1.pdf\">\u003Cem>MSL Ratings and Reflow Profiles\u003C\u002Fem>\u003C\u002Fa>. The note discusses moisture exposure and later heating; use the applicable device, board and project requirements to determine any conditioning.\u003C\u002Fli>\n\u003C\u002Ful>\n\n\u003Csection class=\"related-links\" aria-label=\"Related\">\u003Ch3>Related links\u003C\u002Fh3>\u003Cul>\u003Cli>\u003Ca href=\"\u002Fen\u002Fblog\u002Fwhat-is-bga\">what is a BGA\u003C\u002Fa>\u003C\u002Fli>\u003Cli>\u003Ca href=\"\u002Fen\u002Fpcba\u002Fbga-reballing\">BGA reballing\u003C\u002Fa>\u003C\u002Fli>\u003Cli>\u003Ca href=\"\u002Fen\u002Fblog\u002Fpcb-pad-cratering\">PCB pad cratering\u003C\u002Fa>\u003C\u002Fli>\u003Cli>\u003Ca href=\"\u002Fen\u002Fpcba\u002Fturnkey-assembly\">turnkey PCB assembly\u003C\u002Fa>\u003C\u002Fli>\u003Cli>\u003Ca href=\"\u002Fen\u002Fquote\">PCB or assembly quote\u003C\u002Fa>\u003C\u002Fli>\u003C\u002Ful>\u003C\u002Fsection>",[14,17,20,23,26,29,32,35],{"id":15,"text":16},"does-the-evidence-justify-removing-the-bga","Does the evidence justify removing the BGA?",{"id":18,"text":19},"what-should-be-checked-before-heating-the-board","What should be checked before heating the board?",{"id":21,"text":22},"where-should-the-work-stop-for-a-decision","Where should the work stop for a decision?",{"id":24,"text":25},"how-should-the-replacement-be-selected","How should the replacement be selected?",{"id":27,"text":28},"what-can-inspection-and-testing-prove","What can inspection and testing prove?",{"id":30,"text":31},"what-should-a-rework-request-include","What should a rework request include?",{"id":33,"text":34},"frequently-asked-questions","Frequently asked questions",{"id":36,"text":37},"technical-references","Technical references",[39,40,41,42,43],"BGA rework","BGA replacement","PCB assembly","BGA inspection","PCB repair","bga-board-rework",{"blog":46,"breadcrumb":55,"faq":69},{"@context":47,"@type":48,"headline":4,"description":5,"url":49,"datePublished":6,"dateModified":6,"timeRequired":11,"keywords":50,"articleSection":7,"author":51,"publisher":54},"https:\u002F\u002Fschema.org","BlogPosting","https:\u002F\u002Faptpcb.com\u002Fen\u002Fblog\u002Fbga-board-rework","BGA rework, BGA replacement, PCB assembly, BGA inspection, PCB repair",{"@type":52,"name":53},"Organization","APTPCB",{"@type":52,"name":53},{"@context":47,"@type":56,"itemListElement":57},"BreadcrumbList",[58,63,67],{"@type":59,"position":60,"name":61,"item":62},"ListItem",1,"Home","https:\u002F\u002Faptpcb.com\u002F",{"@type":59,"position":64,"name":65,"item":66},2,"Blog","https:\u002F\u002Faptpcb.com\u002Fen\u002Fblog",{"@type":59,"position":68,"name":44,"item":49},3,{"@context":47,"@type":70,"mainEntity":71},"FAQPage",[72,78,82,86],{"@type":73,"name":74,"acceptedAnswer":75},"Question","Is there a universal maximum number of BGA rework cycles?",{"@type":76,"text":77},"Answer","No single count proves an assembly can tolerate another heating operation. Follow the actual device, board, customer and process requirements, and review the known history and condition before authorizing work.",{"@type":73,"name":79,"acceptedAnswer":80},"Can a passing X-ray image confirm a successful rework?",{"@type":76,"text":81},"It is one part of the agreed evidence. X-ray has method and viewing limitations; assess its findings alongside the process record and the inspection and tests required for the product.",{"@type":73,"name":83,"acceptedAnswer":84},"Is reballing the same as replacing a BGA on the board?",{"@type":76,"text":85},"No. Reballing prepares an off-board package's solder-ball array. Board-level replacement also involves removal, site assessment, placement and verification of the assembled board.",{"@type":73,"name":87,"acceptedAnswer":88},"Does a board that works after replacement need further review?",{"@type":76,"text":89},"Use the agreed release plan. A successful functional test can establish that the functions actually exercised met their test criteria under those conditions, but it does not necessarily identify the original fault or cover all workmanship and reliability requirements.",{"pcbManufacturingColumns":91,"capabilityColumns":219,"resourceColumns":255,"pcbaColumns":299},[92,140,169,198],{"heading":93,"links":94},"PCB Product Families",[95,98,101,104,107,110,113,116,119,122,125,128,131,134,137],{"label":96,"path":97},"FR-4 PCB","\u002Fpcb\u002Ffr4-pcb",{"label":99,"path":100},"High-Speed PCB","\u002Fpcb\u002Fhigh-speed-pcb",{"label":102,"path":103},"Multilayer PCB","\u002Fpcb\u002Fmultilayer-pcb",{"label":105,"path":106},"HDI PCB","\u002Fpcb\u002Fhdi-pcb",{"label":108,"path":109},"Flexible PCB","\u002Fpcb\u002Fflex-pcb",{"label":111,"path":112},"Rigid Flex PCB","\u002Fpcb\u002Frigid-flex-pcb",{"label":114,"path":115},"Ceramic PCB","\u002Fpcb\u002Fceramic-pcb",{"label":117,"path":118},"Heavy Copper PCB","\u002Fpcb\u002Fheavy-copper-pcb",{"label":120,"path":121},"High Thermal PCB","\u002Fpcb\u002Fhigh-thermal-pcb",{"label":123,"path":124},"Antenna PCB","\u002Fpcb\u002Fantenna-pcb",{"label":126,"path":127},"High Frequency PCB","\u002Fpcb\u002Fhigh-frequency-pcb",{"label":129,"path":130},"Microwave PCB","\u002Fpcb\u002Fmicrowave-pcb",{"label":132,"path":133},"Metal Core PCB","\u002Fpcb\u002Fmetal-core-pcb",{"label":135,"path":136},"High-Tg PCB","\u002Fpcb\u002Fhigh-tg-pcb",{"label":138,"path":139},"Backplane PCB","\u002Fpcb\u002Fbackplane-pcb",{"sections":141},[142],{"heading":143,"links":144},"RF & Materials",[145,148,151,154,157,160,163,166],{"label":146,"path":147},"Rogers PCB","\u002Fmaterials\u002Frf-rogers",{"label":149,"path":150},"Taconic PCB","\u002Fmaterials\u002Ftaconic-pcb",{"label":152,"path":153},"Teflon PCB","\u002Fmaterials\u002Fteflon-pcb",{"label":155,"path":156},"Arlon PCB","\u002Fmaterials\u002Farlon-pcb",{"label":158,"path":159},"Megtron PCB","\u002Fmaterials\u002Fmegtron-pcb",{"label":161,"path":162},"ISOLA PCB","\u002Fmaterials\u002Fisola-pcb",{"label":164,"path":165},"Spread Glass FR-4","\u002Fmaterials\u002Fspread-glass-fr4",{"label":167,"path":168},"Impedance Control","\u002Fpcb\u002Fpcb-impedance-control",{"sections":170},[171],{"heading":172,"links":173},"Manufacturing \u002F Stackups",[174,177,180,183,186,189,192,195],{"label":175,"path":176},"Quickturn Prototypes","\u002Fpcb\u002Fquick-turn-pcb",{"label":178,"path":179},"NPI & Small Batch (PCB)","\u002Fpcb\u002Fnpi-small-batch-pcb-manufacturing",{"label":181,"path":182},"High-Volume Production","\u002Fpcb\u002Fmass-production-pcb-manufacturing",{"label":184,"path":185},"High Layer Count PCB","\u002Fpcb\u002Fhigh-layer-count-pcb",{"label":187,"path":188},"PCB Fabrication Process","\u002Fpcb\u002Fpcb-fabrication-process",{"label":190,"path":191},"Advanced PCB Manufacturing","\u002Fpcb\u002Fadvanced-pcb-manufacturing",{"label":193,"path":194},"Special PCB Manufacturing","\u002Fpcb\u002Fspecial-pcb-manufacturing",{"label":196,"path":197},"Multi-Layer Laminated Structure","\u002Fpcb\u002Fmultilayer-pcb-lamination-services",{"heading":199,"links":200},"Specialties & Resources",[201,204,207,210,213,216],{"label":202,"path":203},"PCB Design & Layout Services","\u002Fpcba\u002Fpcb-design-services",{"label":205,"path":206},"PCB Surface Finishes","\u002Fpcb\u002Fpcb-surface-finishes",{"label":208,"path":209},"PCB Drilling & Vias","\u002Fpcb\u002Fpcb-drilling",{"label":211,"path":212},"PCB Stackup","\u002Fpcb\u002Fpcb-stack-up",{"label":214,"path":215},"PCB Profiling","\u002Fpcb\u002Fpcb-profiling",{"label":217,"path":218},"Quality & Inspection","\u002Fpcb\u002Fpcb-quality",[220,225,230,235,240,245,250],{"links":221},[222],{"label":223,"path":224},"Rigid PCB Capability","\u002Fcapabilities\u002Frigid-pcb",{"links":226},[227],{"label":228,"path":229},"Rigid-Flex Capability","\u002Fcapabilities\u002Frigid-flex-pcb",{"links":231},[232],{"label":233,"path":234},"Flex PCB Capability","\u002Fcapabilities\u002Fflex-pcb",{"links":236},[237],{"label":238,"path":239},"HDI PCB Capability","\u002Fcapabilities\u002Fhdi-pcb",{"links":241},[242],{"label":243,"path":244},"Metal PCB Capability","\u002Fcapabilities\u002Fmetal-pcb",{"links":246},[247],{"label":248,"path":249},"Ceramic PCB Capability","\u002Fcapabilities\u002Fceramic-pcb",{"links":251},[252],{"label":253,"path":254},"Heavy Copper PCB Capability","\u002Fcapabilities\u002Fheavy-copper-pcb",[256,267,291],{"heading":257,"links":258},"Downloads",[259,262,265],{"label":260,"path":261},"Materials Datasheet \u002F Processing Notes","\u002Fresources\u002Fdownloads-materials",{"label":263,"path":264},"PCB DFM Guidelines","\u002Fresources\u002Fdfm-guidelines",{"label":196,"path":266},"\u002Fpcb\u002Fmulti-layer-laminated-structure",{"heading":268,"links":269},"Tools",[270,273,276,279,282,285,288],{"label":271,"path":272},"Gerber Viewer","\u002Ftools\u002Fgerber-viewer",{"label":274,"path":275},"PCB Viewer","\u002Ftools\u002Fpcb-viewer",{"label":277,"path":278},"BOM Viewer","\u002Ftools\u002Fbom-viewer",{"label":280,"path":281},"3D Viewer","\u002Ftools\u002F3d-viewer",{"label":283,"path":284},"Circuit Simulator","\u002Ftools\u002Fcircuit-simulator",{"label":286,"path":287},"Impedance Calculator","\u002Ftools\u002Fimpedance-calculator",{"label":289,"path":290},"Trace Width Calculator","\u002Ftools\u002Ftrace-width-calculator",{"heading":292,"links":293},"FAQ & Blog",[294,297],{"label":295,"path":296},"FAQ","\u002Fresources\u002Ffaq",{"label":65,"path":298},"\u002Fblog",[300,330,356,389],{"heading":301,"links":302},"Core Services",[303,306,309,312,315,318,321,324,327],{"label":304,"path":305},"Turnkey PCB Assembly","\u002Fpcba\u002Fturnkey-assembly",{"label":307,"path":308},"NPI & Small Batch PCB Assembly","\u002Fpcba\u002Fnpi-assembly",{"label":310,"path":311},"Mass Production PCB Assembly","\u002Fpcba\u002Fmass-production",{"label":313,"path":314},"Flex & Rigid-Flex PCB Assembly","\u002Fpcba\u002Fflex-rigid-flex",{"label":316,"path":317},"SMT & Through-Hole Assembly","\u002Fpcba\u002Fsmt-tht",{"label":319,"path":320},"BGA PCB Assembly","\u002Fpcba\u002Fbga-qfn-fine-pitch",{"label":322,"path":323},"Components & BOM Management","\u002Fpcba\u002Fcomponents-bom",{"label":325,"path":326},"Box Build Assembly","\u002Fpcba\u002Fbox-build-assembly",{"label":328,"path":329},"PCB Assembly Testing & Quality","\u002Fpcba\u002Ftesting-quality",{"heading":331,"links":332},"Supporting Services",[333,335,338,341,344,347,350,353],{"label":334,"path":203},"PCB Design & Layout",{"label":336,"path":337},"Every Support Touchpoint","\u002Fpcba\u002Fsupport-services",{"label":339,"path":340},"Stencil Lab","\u002Fpcba\u002Fpcb-stencil",{"label":342,"path":343},"Components Sourcing","\u002Fpcba\u002Fcomponent-sourcing",{"label":345,"path":346},"IC Programming","\u002Fpcba\u002Fic-programming",{"label":348,"path":349},"Conformal Coating","\u002Fpcba\u002Fpcb-conformal-coating",{"label":351,"path":352},"Selective Soldering","\u002Fpcba\u002Fpcb-selective-soldering",{"label":354,"path":355},"BGA Reballing","\u002Fpcba\u002Fbga-reballing",{"heading":357,"links":358},"Quality & Testing",[359,362,365,368,371,374,377,380,383,386],{"label":360,"path":361},"Quality Inspection","\u002Fpcba\u002Fquality-system",{"label":363,"path":364},"First Article Inspection (FAI)","\u002Fpcba\u002Ffirst-article-inspection",{"label":366,"path":367},"Solder Paste Inspection (SPI)","\u002Fpcba\u002Fspi-inspection",{"label":369,"path":370},"AOI Optical Inspection","\u002Fpcba\u002Faoi-inspection",{"label":372,"path":373},"X-Ray \u002F CT Inspection","\u002Fpcba\u002Fxray-inspection",{"label":375,"path":376},"ICT In-Circuit Testing","\u002Fpcba\u002Fict-test",{"label":378,"path":379},"Flying Probe Testing","\u002Fpcba\u002Fflying-probe-testing",{"label":381,"path":382},"FCT \u002F Functional Testing","\u002Fpcba\u002Ffct-test",{"label":384,"path":385},"Final Inspection & Packing","\u002Fpcba\u002Ffinal-quality-inspection",{"label":387,"path":388},"Incoming Quality Control","\u002Fpcba\u002Fincoming-quality-control",{"heading":390,"linkClass":391,"links":392},"Industry Applications (Entry)","text-nowrap",[393,396,399,402,405,408,411,414,417,420,423],{"label":394,"path":395},"Server \u002F Data Center","\u002Findustries\u002Fserver-data-center-pcb",{"label":397,"path":398},"Automotive \u002F EV","\u002Findustries\u002Fautomotive-electronics-pcb",{"label":400,"path":401},"Medical","\u002Findustries\u002Fmedical-pcb",{"label":403,"path":404},"Telecom \u002F 5G","\u002Findustries\u002Fcommunication-equipment-pcb",{"label":406,"path":407},"Aerospace & Defense","\u002Findustries\u002Faerospace-defense-pcb",{"label":409,"path":410},"Drone \u002F UAV","\u002Findustries\u002Fdrone-uav-pcb",{"label":412,"path":413},"Industrial Control & Automation","\u002Findustries\u002Findustrial-control-pcb",{"label":415,"path":416},"Power & New Energy","\u002Findustries\u002Fpower-energy-pcb",{"label":418,"path":419},"Robotics & Automation","\u002Findustries\u002Frobotics-pcb",{"label":421,"path":422},"Security \u002F Security Equipment","\u002Findustries\u002Fsecurity-equipment-pcb",{"label":424,"path":425},"PCB Industry Overview →","\u002Fpcb-industry-solutions",1794926050305]