Material receipt → production release
Received is a status.Released is a decision.
Link incoming material to the approved BOM, handling requirements and documented lot disposition before assembly.

01 / Release status
Give each incoming lot a traceable disposition.
| Disposition | Release condition |
|---|---|
| Released | The received lot meets the agreed inspection and acceptance criteria. |
| On hold | Unresolved identity, condition or source issues prevent production release. |
| Additional inspection | The risk requires a suitable, separately agreed inspection method. |
| Customer disposition | A documented customer decision resolves a discrepancy before assembly. |
Scroll the table to review all columns.
02 / Material risk
Check the received lot against its intended build.
What PCBA incoming quality control resolves before assembly

Risk-based IQC release matrix for component lots
| Risk | Inspection point | Customer data needed | Possible release evidence |
|---|---|---|---|
| BOM or AVL mismatch | Check manufacturer part number, manufacturer, package, value, tolerance, voltage, temperature range, polarity and approved alternates. | BOM revision, AVL, do-not-substitute lines, approved alternates and change status. | Deviation record, documented alternate approval or hold decision. |
| Unclear source or counterfeit risk | Review supply channel, labels, packaging condition, date and lot codes, surface markings and visible relabeling signs. | Source restrictions, CoC/CoA needs, critical-parts list and contractual test requirements. | Supplier trace, label photographs, quarantine decision and, where applicable, an external laboratory report. |
| Moisture-sensitive SMDs | Check MSL label, moisture-barrier bag, humidity indicator card, desiccant, opening time and remaining floor life. | MSL level, package, process instruction and dry-storage or bake rules. | Material status, opening-time record and documented kitting release. |
| Customer-supplied components | Check packing list, project assignment, quantity, labels, packaging, visual condition and agreed ESD/MSL data. | Packing list, owner/project ID, shortage rule and disposition for excess or rejected material. | Receiving report, discrepancy notice, lot link and customer disposition. |
| Critical, obsolete or high-cost parts | Increase inspection depth according to function, availability, source, lot history and failure consequence. | Criticality, date-code window, traceability depth, test method and retention period. | Inspection summary, sampling data, retained labels or a nonconformance report. |
Scroll the table to review all columns.
03 / The approved BOM
Resolve the part and revision before kitting.
Receiving connects the actual component lot to its approved manufacturer part number, package and permitted alternates.

04 / Inspection boundaries
Define when receiving checks need additional evidence.
Scope note Label and visual checks can reveal anomalies. Additional tests require a suitable technical plan and an agreed disposition before material release.

Baseline receiving inspection
Special testing & authenticity review
05 / Handling status
Carry moisture and ESD requirements through kitting.
06 / Consigned material
Keep project ownership and discrepancies visible.

Inputs that shorten IQC planning
APTPCB will confirm which baseline checks can be covered within the PCBA project, which special tests need separate confirmation and which records are proposed as release evidence.
PRACTICAL QUESTIONS
Scope, acceptance and practical limits
What does incoming quality control cover for a PCBA build?
What information does APTPCB need for an IQC plan?
Does visual inspection prove that an electronic component is authentic?
How is the IQC sample size determined?
How are moisture-sensitive SMD components controlled?
Can customer-supplied components be included in the IQC process?
ENGINEERING & PRODUCTION REVIEW
Define the incoming material release gate.
Identify the material risks, permitted alternates and records needed for your PCBA project.
- BOM revision, AVL and approved alternates
- Date-code limits and source restrictions
- MSL / ESD and consigned-parts requirements
- Sampling, release criteria and required evidence